200kW/500kWh
Industrial Park Peak-load Shifting Project in Guangdong
Delivery time: Nov, 2023
Delivered products: 2 sets of 100kW/215kWh EnerArk2.0 integrated outdoor battery energy storage cabinets, totaling 200kW/500kWh
Application: The ESS is operating with on-grid mode. It can help the industrial park earn arbitrage benefits from the TOU tariff by peak-load shifting.