120kW/336kWh
Industrial Park Peak-load Shifting Project in Guangdong
Delivery time: Aug, 2022
Delivered products: 2 sets of 60kW/168kWh EnerArk1.1 integrated outdoor battery energy storage cabinets, totaling 120kW/336kWh
Application: The ESS is operating with on-grid mode. It can help the industrial park earn arbitrage benefits from the TOU tariff by peak-load shifting.
Previous
200kW/500kWh
Next
200kW/500kWh
Previous :
100kW/215kWh
Next :
200kW/500kWh